«Leaders Guide Trenching and Shoring Safety - Competent Person The manual for Excavations Trenching and Shoring is produced in Adobe Acrobat. The ...»

-- [ Page 9 ] --

_ If the ramp is used for access and egress of equipment, is the employee able to identify that the ramp must be qualified in structural design?

__________________________________________

List qualifications of equipment ramp:

________________________________________________________________

________________________________________________________________

____________

Was the employee able to determine if the ramp meets design qualifications?

________________________________________________________________

_____ List all qualifications of UC Irvine employee being evaluated as a Competent

Person:

Has the competent person performed all tasks required by the Excavations standard? __________ Is the person capable of identifying existing and predictable hazards in the surrounding or working conditions, which are unsanitary, hazardous, or dangerous to employees?

________________________________________________________________

_ Is the competent person authorized to take prompt corrective measures to eliminate such hazards or conditions?

________________________________________________________________

_ Appendix 3: General Requirements-Excavations §1541.General Requirements (a) Surface encumbrances. All surface encumbrances that are located so as to create a hazard to employees shall be removed or supported, as necessary, to safeguard employees.

(b) Subsurface installations.

(1) The approximate location of subsurface installations, such as sewer, telephone, fuel, electric, water lines, or any other subsurface installations that reasonably may be expected to be encountered during excavation work, shall be determined by the excavator prior to opening an excavation.

(A) Excavation shall not commence until:

1. The excavation area has been marked as specified in Government Code Section 4216.2 by the excavator; and

2. The excavator has received a positive response from all known owner/operators of subsurface installations within the boundaries of the proposed project; those responses confirm that the owner/operators have located their installations, and those responses either advise the excavator of those locations or advise the excavator that the owner/operator does not operate a subsurface installation that would be affected by the proposed excavation.

(B) When the excavation is proposed within 10 feet of a high priority subsurface installation, the excavator shall be notified by the facility owner/operator of the existence of the high priority subsurface installation before the legal excavation start date and time in accordance with Government Code Section 4216.2(a), and an onsite meeting involving the excavator and the subsurface installation owner/operator's representative shall be scheduled by the excavator and the owner/operator at a mutually agreed on time to determine the action or activities required to verify the location of such installations. High priority subsurface installations are high pressure natural gas pipelines with normal operating pressures greater than 415 kPA gauge (60 p.s.i.g.), petroleum pipelines, pressurized sewage pipelines, conductors or cables that have a potential to ground of 60,000 volts or more, or hazardous materials pipelines that are potentially hazardous to employees, or the public, if damaged.

(C) Only qualified persons shall perform subsurface installation locating activities, and all such activities shall be performed in accordance with this section and Government Code Sections 4216 through 4216.9. Persons who complete a training program in accordance with the requirements of Section 1509, Injury and Illness Prevention Program (IIPP), that meets the minimum training guidelines and practices of the Common Ground Alliance (CGA) Best Practices, Version 3.0, published March 2006, or the standards of the National Utility Locating Contractors Association (NULCA), Standard 101: Professional Competence Standards for Locating Technicians, 2001, First Edition, which are incorporated by reference, shall be deemed qualified for the purpose of this section.

(D) Employees who are involved in the excavation operation and exposed to excavation operation hazards shall be trained in the excavator notification and excavation practices required by this section and Government Code Sections 4216 through 4216.9.

(2) All Regional Notification Centers as defined by Government Code Section 4216(j) in the area involved and all known owners of subsurface facilities in the area who are not members of a Notification Center shall be advised of the proposed work at least 2 working days prior to the start of any digging or excavation work. EXCEPTION: Repair work to subsurface facilities done in response to an emergency as defined in Government Code Section 4216(d).

(3) When excavation or boring operations approach the approximate location of subsurface installations, the exact location of the installations shall be determined by safe and acceptable means that will prevent damage to the subsurface installation, as provided by Government Code Section 4216.4.

(4) While the excavation is open, subsurface installations shall be protected, supported, or removed as necessary to safeguard employees.

(5) An excavator discovering or causing damages to a subsurface installation shall immediately notify the facility owner/operator or contact the Regional Notification Center to obtain subsurface installation operator contact information immediately after which the excavator shall notify the facility operator. All breaks, leaks, nicks, dents, gouges, grooves, or other damages to an installation's lines, conduits, coatings or cathodic protection shall be reported to the subsurface installation operator. If damage to a high priority subsurface installation results in the escape of any flammable, toxic, or corrosive gas or liquid or endangers life, health or property, the excavator responsible shall immediately notify 911, or if 911 is unavailable, the appropriate emergency response personnel having jurisdiction. The facility owner/operator shall also be contacted.





Note: The terms excavator and operator as used in Section 1541(b) shall be as defined in Government Code Section 4216(c) and (h) respectively. The term "owner/operator" means an operator as the term "operator" is defined in Government Code Section 4216(h).

(c) Access and egress.

(1) Structural ramps.

(A) Structural ramps that are used solely by employees as a means of access or egress from excavations shall be designed by a competent person. Structural ramps used for access or egress of equipment shall be designed by a competent person qualified in structural design, and shall be constructed in accordance with the design.

(B) Ramps and runways constructed of two or more structural members shall have the structural members connected together to prevent displacement.

(C) Structural members used for ramps and runways shall be of uniform thickness.

(D) Cleats or other appropriate means used to connect runway structural members shall be attached to the bottom of the runway or shall be attached in a manner to prevent tripping.

(E) Structural ramps used in lieu of steps shall be provided with cleats or other surface treatments to the top surface to prevent slipping.

(2) Means of egress from trench excavations.

A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet or more in depth so as to require no more than 25 feet of lateral travel for employees.

(d) Exposure to vehicular traffic. Employees exposed to public vehicular traffic shall be provided with, and shall wear; warning vests or other suitable garments marked with or made of reflectorized or high-visibility material.

(e) Exposure to falling loads. No employee shall be permitted underneath loads handled by lifting or digging equipment. Employees shall be required to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling materials. Operators may remain in the cabs of vehicles being loaded or unloaded when the vehicles are equipped, in accordance with Section 1591(e), to provide adequate protection for the operator during loading and unloading operations.

(f) Warning system for mobile equipment. When mobile equipment is operated adjacent to an excavation, or when such equipment is required to approach the edge of an excavation, and the operator does not have a clear and direct view of the edge of the excavation, a warning system shall be utilized such as barricades, hand or mechanical signals, or stop logs. If possible, the grade should be away from the excavation.

(g) Hazardous atmospheres.

(1) Testing and controls. In addition to the requirements set forth in the Construction Safety Orders and the General Industry Safety Orders to prevent exposure to harmful levels of atmospheric contaminants and to assure

acceptable atmospheric conditions, the following requirements shall apply:

(A) Where oxygen deficiency (atmospheres containing less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, the atmospheres in the excavation shall be tested before employees enter excavations greater than 4 feet in depth.

(B) Adequate precautions shall be taken to prevent employee exposure to atmospheres containing less than 19.5 percent oxygen and other hazardous atmospheres. These precautions include providing proper respiratory protection or ventilation.

(C) Adequate precaution shall be taken such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 10 percent of the lower flammable limit of the gas.

(D) When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, testing shall be conducted as often as necessary to ensure that the atmosphere remains safe.

(2) Emergency rescue equipment.

(A) Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, shall be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment shall be attended when in use.

(B) Employees entering bell-bottom pier holes, or other similar deep and confined footing excavations, shall wear a harness with a lifeline securely attached to it.

The lifeline shall be separate from any line used to handle materials, and shall be individually attended at all times while the employee wearing the lifeline is in the excavation.

(h) Protection from hazards associated with water accumulation.

(1) Employees shall not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline.

(2) If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation.

(3) If excavation work interrupts the natural drainage of surface water (such as streams), diversion ditches, dikes, or other suitable means shall be used to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation. Excavations subject to runoff from heavy rains will require an inspection by a competent person and compliance with Sections 1541 (h)(1) and (h)(2).

(i) Stability of adjacent structures.

(1) Where the stability of adjoining buildings, walls, or other structures is endangered by excavation operations, support systems such as shoring, bracing, or underpinning shall be provided to ensure the stability of such structures for the protection of employees.

(2) Excavation below the level of the base or footing of any foundation or retaining wall that could be reasonably expected to pose a hazard to employees

shall not be permitted except when:

(A) A support system, such as underpinning, is provided to ensure the safety of employees and the stability of the structure; or (B) The excavation is in stable rock; or (C) A registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees.

(3) Sidewalks, pavements and appurtenant structure shall not be undermined unless a support system or another method of protection is provided to protect employees from the possible collapse of such structures.

(j) Protection of employees from loose rock or soil.

(1) Adequate protection shall be provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection shall consist of scaling to remove loose material; installation of protective barricades at intervals as necessary on the face to stop and contain falling material; or other means that provide equivalent protection.

(2) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.

(k) Inspection.

(1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rain storm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.



Pages:     | 1 |   ...   | 7 | 8 || 10 | 11 |   ...   | 13 |


Similar works:

«Media Release July 31, 2009 For immediate publication Contact: Rainer Weihofen, Sika AG Zugerstrasse 50 Corporate Communications & Investor Relations CH-6341 Baar, Switzerland Tel.: +41 58 436 68 00 www.sika.com Fax: +41 58 436 68 50 weihofen.rainer@ch.sika.com Half-Year Report 2009 Sika shows fortitude in a tough market environment Latin America, Region IMEA (India, Middle East, Africa) and China continue to show solid growth figures, while USA, Europe and some Asian countries register slumps...»

«Research Report Multilingual Generalization of the ModelCreator Software for Math Item Generation Derrick Higgins Yoko Futagi Paul Deane April 2005 Research & RR-05-02 Development Multilingual Generalization of the ModelCreator Software for Math Item Generation Derrick Higgins, Yoko Futagi, and Paul Deane ETS, Princeton, NJ April 2005 As part of its educational and social mission and in fulfilling the organization's nonprofit charter and bylaws, ETS has and continues to learn from and also to...»

«Interview Transcript: Marie Genca Kotz-11/5/02 M: This is Marian Krzyzowski and I am in Dearborn Michigan at the home of Marie Genca Kotz and today is November 5th, 2002 and we’re here to talk about Chene Street. And what I would like to do to begin with is to get a little information about your family, yourself, and how you ended up on Chene Street, and so maybe you could just tell me the names of your parents and where they were from and how they ended up on Chene Street. MGK: Well my...»

«CLIENT PUBLICATION FINANCIAL INSTITUTIONS ADVISORY & FINANCIAL REGULATORY 8 December 2014 TLAC: An Additional Capital Requirement for G-SIBs The Financial Stability Board recently issued for consultation If you wish to receive more information on the topics covered proposals to increase the loss-absorbing capacity of global in this publication, you may contact systemically important banks over and above the fully loaded Basel III your regular Shearman & Sterling contact person or any of the...»

«Handbook of Microalgal Culture: Biotechnology and Applied Phycology Edited by Amos Richmond This page intentionally left blank Handbook of Microalgal Culture This page intentionally left blank Handbook of Microalgal Culture: Biotechnology and Applied Phycology Edited by Amos Richmond Ó 2004 by Blackwell Science Ltd First published 2004 a Blackwell Publishing company Library of Congress Editorial Offices: Cataloging-in-Publication Data 9600 Garsington Road, Oxford OX4 2DQ, UK Handbook of...»

«2015 JDRF Illinois One Dream Gala Auction Catalog as of 12/10/2015 LIVE AUCTION 1-American Idol Series Finale This is your chance to be in the audience during the series finale of American Idol! Two guests will jet off to Los Angeles for the LIVE filming of the American Idol series finale in May 2016 (estimated date). Witness the crowning of American Idol’s next (and last!) superstar at the Nokia Theater with judges Jennifer Lopez, Harry Connick, Jr., and Keith Urban and host Ryan Seacrest...»

«A Social Constructionist Approach to Phenomenographic Analysis of Identity Positioning in Networked Learning Marguerite Koole Centre for Distance Education, Athabasca University, mkoole@athabascau.ca Centre for Technology Enhanced Learning, Educational Research, Lancaster University, UK, (PhD Student) Abstract The aims of this research are to explore how doctoral students on networked learning courses experience challenges to their identities, norms, values, and relationships. Within a...»

«Masherbrum, 7821 m Erkundung, Erstbesteigung, Erstbegehungen, Ereignisse (von Günter Seyfferth, www.himalaya-info.org) Erster Besteigungsversuch über die Südostflanke durch eine britische Expedition unter Leitung von James Waller Die Anregung, einen ersten Besteigungsversuch am Masherbrum zu wagen, war von der britischen Expedition zum Saltoro Kangri im Jahr 1935 gekommen. Vom Kaphulu am Shyok River hatte man die kühne Form des Berges bewundert. Die britische Expedition unter Leitung von...»

«The American Legion CITIZENSHIP OUTREACH GUIDE TABLE OF CONTENTS A message from the Americanism chairman......................1 Foreword......................................................2 Where to begin................................................2 Suggested citizenship outreach activities.........................2 Naturalization oath...»

«Get Detail Destination Dissertation A Traveler S Guide To Done to read online. Share Destination Dissertation A Traveler S Guide To Done PDF file to free download books DESTINATION DISSERTATION A TRAVELER S GUIDE TO DONE PDF Download: DESTINATION DISSERTATION A TRAVELER S GUIDE TO DONE PDF DESTINATION DISSERTATION A TRAVELER S GUIDE TO DONE PDF Read title destination dissertation a traveler s guide to done PDF? You will be glad to know that right now destination dissertation a traveler s guide...»

«Macroscale Hydrological Modelling and Impact of landcover change on streamflows of the Mahanadi River Basin Thesis submitted to Andhra University in partial fulfillment of the requirements for the award of Master of Technology in Remote Sensing and Geographical Information System ANDHRA UNIVERSITY By Nidhi Mishra Supervised By Dr. S. P. Aggarwal Dr. V. K. Dadhwal Scientist/Engineer“SE”, Dean, IIRS Water Resources Division, Dehradun IIRS, Dehradun iirs Indian Institute of Remote Sensing...»

««Liquidität» – eine Herausforderung für die Banken Dr. Philipp M. Hildebrand Mitglied des Direktoriums Schweizerische Nationalbank Tagung: «Liquidität» – eine Herausforderung für die Banken 11. Januar 2005 1. Einführung Die Krisenresistenz des internationalen Finanzsystems konnte in den vergangenen Jahrzehnten dank weitreichenden Anstrengungen von Finanzinstituten, Zentralbanken sowie Regulatoren markant verbessert werden. International kompatible Eigenkapitalanforderungen wurden...»





 
<<  HOME   |    CONTACTS
2016 www.thesis.xlibx.info - Thesis, documentation, books

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.