1. Guide Overview

This User Guide provides background on the concentrating photovoltaic version of the

California Solar Initiative (CSI) Incentive Calculator, describes how the calculator

determines the CSI incentives for a proposed concentrating photovoltaic system and

detailed step by step instructions on its use. The calculator is web-accessible at

http://www.csi-epbb.com.

2. CSI Eligibility Eligible concentrating photovoltaic (CPV) projects must be located within sites where the Host Customer is a Pacific Gas & Electric (PG&E), Southern California Edison (SCE) or San Diego Gas & Electric (SDG&E) retail electric customer.1 Systems between 1 kW and 5,000 kW are eligible to participate in CSI, however incentives are paid on the first 1,000 kW of installed capacity. All systems are eligible for Performance Based Incentives (PBI).

All customer classes are eligible for CSI except for residential new construction systems which must apply to the New Solar Home Partnership (NSHP) program. NSHP details may be found at http://www.gosolarcalifornia.ca.gov/nshp/. The CSI calculator is currently not applicable to systems applying to the NSHP.

Program eligibility details can be found at the Go Solar California and CSI Program Administrators’ websites listed below

• Go Solar California http://www.gosolarcalifornia.ca.gov/

• PG&E http://www.pge.com/csi

• SCE http://www.sce.com/csi

• CCSE http://www.energycenter.org/ContentPage.asp?ContentID=377&SectionID=406& SectionTarget=370 Municipal electric utility customers are not eligible to receive incentives from the above designated program administrators.

Note that the California Center for Sustainable Energy (CCSE) is the Program Administrator for CSI in SDG&E’s service territory.

November 17, 2008

-1CSI CPV Calculator v1 User Guide rev 0-0.doc

3. CSI Incentive Calculator Overview The CSI calculator is an internet accessible tool (http://www.csi-epbb.com) used to determine the Design Factor and the resulting PBI incentive for eligible CPV systems.2 The calculator determines the CSI incentive for a single type of CPV system and inverter combination. The incentive for multiple units of the same type of CPV system and/or inverter can be accommodated by the calculator in a single calculation. Mixed systems that use different types of inverters, CPV systems, PV + CPV hybrids require individual incentive calculations for each combination and the incentives summed. More details on mixed system CSI incentive calculation can befound in Section 6 of this guide.

When first opened, the calculator has an input page, where the user inputs the project name, zip code location of the system, the customer’s electric utility, type of customer, the type and number of CPV systems, the type and number of inverters, tracking method, the proposed system’s tilt and azimuth (if applicable) and the estimated annual system production (kWh/yr).

Once all required data is entered, the user initiates the calculator by pressing the “GO” button. The calculator then uses the inputs to determine the resulting CSI incentive for the proposed system.

The user can press the “Recalculate” button, found at the bottom of the results screen, to return to the input page and make adjustments to their original inputs.

4. Required Calculator Inputs The CSI calculator is configured to calculate the incentive for a single CPV system type, inverter type. For example if a system utilizes two different inverter models, but the two of the same type of CPV system, the calculator must be run twice. More details on mixed system EPBB incentive calculation can be found in Section 6 of this guide.

The inputs for the calculator are described below.

Project Name: This is text string identifying the project. It is repeated at the top of the results page to help the user identify which project the results are for.

ZIP Code: This is the zip code of the location of the proposed PV system. Note that this zip code must be located within the specified utility’s service territory where the system is or will be located.

Utility: This is the utility in whose service territory the proposed PV system is or will be located. Note that the zip code inputted must be located within the specified utility’s service territory.

Note that CSI calculator PBI results are used by the Program Administrator to set-aside funds for future PBI payments. The CSI PBI results are not a guarantee of payment. PBI payments are based on the actual metered output of the proposed system.

–  –  –

Customer Type: Select the customer classification associated with the Host Customer.

For definitions of the various customer types, refer to the latest California Solar Initiative Program Handbook.

Concentrating PV Module: The make and model of the proposed CPV system is typed here.

PTC Rating: The PVUSA Test Condition rating for the proposed CPV system is input here.

Number of Modules: This is the total number of CPV systems of the designated type that will be connected to the inverter(s) that are selected below.

Inverter: This is the type of inverter that will be used with the proposed PV system. The options in this pull-down are based on the CEC’s list of eligible inverters found at http://www.consumerenergycenter.org/cgi-bin/eligible_inverters.cgi. If multiple inverter types are to be used, you must make multiple CSI calculator runs. Also, if the CEC-AC rating of the proposed system is greater than 125% of the inverter rating, an error is flagged which must be corrected (by reducing the number of panels, choosing a lower PTC rated panel, increasing the number of inverters or choosing a larger capacity inverter) before being allowed to proceed to the results page. See description of "CECAC Rating" in Section 5 of this guide for more discussion on oversized systems.





Number of Inverters: This is the total number of inverters of the selected type that will be installed for use with the PV modules selected above.

Minimal Shading: This is a deactivated input until a method for shading can be determined.

Shading Derate Factors (%): This is a deactivated input until a method for shading can be determined.

Tracking: This is the tracking method and number of tracking axis.

Array Tilt (degrees): This is only applicable for fixed or single axis tracking systems.

This is the proposed system tilt from horizontal. Flat (horizontal) systems have a 0º tilt.

Array Azimuth (degrees): This is only applicable for fixed systems. This is the horizontal direction (“true” north-south) the proposed system is pointing; due South is 180º azimuth and due North is 0º azimuth. The optimal reference system for proposed flat (horizontal) systems is assumed to have a 180º azimuth. Magnetic direction measured by a compass can be converted to “true” direction by adding the appropriate magnetic declination for the specific location. Magnetic declination can be determined at the NOAA website (http://www.ngdc.noaa.gov/geomagmodels/Declination.jsp).

November 17, 2008

-3CSI CPV Calculator v1 User Guide rev 0-0.doc Estimated Annual Production: The estimated electric energy output of the CPV system is input here. Annual electric production must be estimated using performance parameters established by SRCC or Sandia National Laboratories, and site specific typical meteorological year weather data. Acceptable models are the Solar Advisory Model (https://www.nrel.gov/analysis/sam) or TRNSYS (http://sel.me.wisc.edu/trnsys).

Other modeling approaches may be considered on a case by case basis by the Program Administrator.

After the inputs are set, the user can click the “GO” button and the calculations will be executed. If an input error is detected, the calculator will refresh the input page and note the error with a comment at the bottom and an asterisk next to the field containing the error. The error must be corrected before the calculator will proceed to the results output page.

5. Description of the Outputs Once the calculator has completed its computations, it will display a results page containing inputs (Site Specifications and CPV System Specifications) and outputs (Results) for the proposed and reference optimal system, as well as the Design Factor and calculated incentive. If the user wishes to apply to the CSI program, they must include a hardcopy of the CSI Calculator results screen in their application materials.

The outputs are described below.

PV Module: Lists the specified PV module name and module DC rating per panel; STC, and PTC.

DC Rating (kW PTC): This is the calculated total DC PTC rated capacity of the PV modules and is calculated by multiplying the PTC module rating by the number of panels. This capacity is used to calculate the CEC-AC rating of the system.

Annual kWh: This is the estimated annual energy output of the proposed system. This value is reported for the sole purpose of transparency of the calculator and is not a guarantee of future system performance.

CEC-AC Rating: This is the product of the PV module PTC rating, module count and inverter efficiency. If the CEC-AC rating exceeds the rated capacity of the inverter by no more than 125%, a warning is displayed on the results page. This warning is only informational and does not prevent the user from proposing the system in a CSI application.3 Capacity Factor: This is the estimated annual output of the proposed system divided by the product of 8760 annual hours and the proposed system’s CEC-AC rating.

Some inverters allow operation above their rated capacity, to a degree, for at least short periods limited by their operating temperature and amperage carrying capability. The CSI Program Administrators reserve the right to seek justification for proposed oversized systems which may result in poor reliability due to mis-matched equipment.

–  –  –

Prevailing Capacity Factor: This is 18% for incentive steps 2 and 3 and 20% for incentive steps 4 through 10.

Design Factor: This is the ratio of the Capacity Factor and the Prevailing Capacity Factor. This Design Factor is not used to directly calculate the PBI incentive amount.

The Program Administrators use it to modify the CEC-AC rating of the system for incentive trigger tracking purposes.

Eligible Annual kWh: This is the annual performance prorated to 1 MW CEC-AC for systems that are larger than 1 MW. If the system is equal to or smaller than 1 MW than the Eligible Annual kWh is the same as the Annual kWh above.

Incentive Rate: This is the current CSI PBI incentive rate ($/kWh) and depends on the selected utility and customer type. It is obtained directly from the CSI Trigger Tracker located at www.csi-trigger.com.

Incentive: This is the estimated total incentive for the proposed system, and is calculated as the estimated annual output times the incentive rate times 5 years. The incentive paid will be based on the actual production of the installed system.

Report Generated on: is a date and time stamp to document when the report run occurred.

6. Multiple Systems or Inverter Types If a proposed system consists of CPV systems with different inverter types, if different CPV systems or installed as part of a conventional PV system, a CSI calculator run must be done for each configuration and the resulting incentives totaled.

If two CPV systems are installed one with an inverter of type “Z” and the other inverter of type “X”, the user must make one calculator run with one system with inverter “Z” and second calculator run with inverter “X”. The incentives from the two runs must then be added together.

7. Shading Input Requirements Shading input is not activated at this time until a shade methodology for tracking CPV systems is developed.

8. PBI Incentive Computation Details The PBI incentive is calculated with the following formula.

PBI Incentive = Incentive Rate x Est. Annual Output x Five Years Where,

–  –  –

PBI Incentive – is the total estimated monetary incentive paid monthly over a five year period. Note that this estimate is used by the Program Administrators to set-aside funds for future payments. It is not a guarantee of payment. Actual payments are based on the metered output of the PV system, which may vary significantly from the PBI Incentive estimate provided by the calculator.

Incentive Rate – is the PBI incentive rate ($/kWh) available at the time of application.

The table below presents the PBI incentive rate schedule.

–  –  –

Annual kWh: This is the estimated annual energy output of the proposed system.

9. Getting Help & Providing Comments Questions and comments regarding the calculator or this User Guide should be emailed to CSI-EPBB@aesc-inc.com. Questions will be addressed on a first-come first-served basis.

–  –  –





Similar works:

«SeDeX − PLAIN AVVISO n.2910 12 Febbraio 2008 VANILLA : Mittente del comunicato Borsa Italiana : Societa' oggetto BAYERISCHE HYPO− UND VEREINSBANK dell'Avviso : Oggetto Inizio negoziazione Covered Warrant Plain Vanilla BAYERISCHE HYPO− UND VEREINSBANK AG emessi nell'ambito di un Programma Testo del comunicato Si veda allegato. Disposizioni della Borsa Strumenti finanziari: “Covered Warrants linked to Indices” Emittente: Bayerische Hypound Vereinsbank A.G. Rating Emittente: Società...»

«Dispatcher Assisted CPR Toolkit Dispatcher Assisted CPR DISPATCHER ASSISTED CPR PROGRAM TOOLKIT This tool kit is free to EMS agencies interested in implementing a dispatcher assisted CPR program. The materials have been developed to provide stepby-step instructions for implementing a program and useful materials to assist you in that process. This and other toolkits may also be found at http://resuscitationacademy.org/. Version 1.0 October 2010 Version 1.0 October 2010 Dispatcher Assisted CPR...»

«THE HOME SELLER’S HANDBOOK From the Office of MINNESOTA ATTORNEY GENERAL LORI SWANSON www.ag.state.mn.us The Home Seller’s Handbook is written and published by the Minnesota Attorney General’s Office. This edition was published in May 2009 in St. Paul, Minnesota. This handbook is available in other formats upon request. The Attorney General’s Office values diversity and is an equal opportunity employer. Minnesota Attorney General’s Office, 2009 www.ag.state.mn.us Table of Contents...»

«1 Vatican II 1962-1965 – 21st Ecumenical Council Notes for a quick overview of the Council to stimulate discussion on a new historical/theological vision for the RC Church The French Council Fathers were heard to say: ‘To be a good Council Father you need the patience of Job and the wisdom of Solomon and it also helps if you have a cast iron bottom – alas’. (Read these notes in conjunction with my paper on ‘Guests in Their House: Women at Vatican II’). Note: It is clear that male...»

«Master of Arts in Counseling Program LIFESPAN DEVELOPMENT (COUN 510) EARLY SPRING 2013 _ Course Dates: January 13 – March 9, 2013 Professor: Jonathan Burchard Email: jburchard@messiah.edu Office: Can meet on campus. Hours: Available by appointment—by phone, in person, skype, or Digital Samba Cell Phone: Faculty Availability: I will be checking in on the course at least once a day during the work week (Monday-Friday), and at least once over the weekend, unless otherwise notified. I am also...»

«Investigation Report With Post Investigation Update: March 1, 2011 Main Track Train Derailment Ontario Northland Freight Train No. 308 Mile 10 Ramore Subdivision Englehart, Ontario March 30, 2007 EXECUTIVE SUMMARY On March 30, 2007, Ontario Northland Railway (ON; Ontario Northland) southward freight train No. 308 travelling south to Englehart, Ontario derailed 22 cars at Mile 10 of the Ramore Subdivision near Englehart, Ontario; 15 derailed tank cars contained sulphuric acid, and 7 derailed...»

«Towards a Unified System of Land Burdens?Editors: Sjef van Erp Bram Akkermans Towards a Unified System of Land Burdens?INTERSENTIA Ius Commune Europaeum Editors: Sjef van Erp Bram Akkermans Towards a Unified System of Land Burdens? ISBN-10: 90-5095-585-1 ISBN-13: 978-90-5095-585-0 D/2006/7849/45 NUR 822 © 2006 Intersentia Antwerpen – Oxford No part of this book may be reproduced in any form, by print, photo copy, microfilm or any other means, without written permission from the author....»

«Smart DFSORT Tricks October, 2010 DFSORT Web Site For papers, online books, news, tips, examples and more, visit the DFSORT website at URL: http://www.ibm.com/storage/dfsort ii Smart DFSORT Tricks Contents Smart DFSORT Tricks 1 Introduction: Details of functions used in tricks 1 Introduction: PTF level of functions needed for tricks 1 Update count and total in existing trailer 2 Create large records from small records 4 Create small records from large records 5 Convert between different types...»

«Estimating Neighborhood Effects on Turnout from Geocoded Voter Registration Records∗ Michael Barber† Kosuke Imai‡ First Draft: April 6, 2013 This Draft: January 28, 2014 Abstract Do voters turn out more or less frequently when surrounded by those like them? While decades of research examined the determinants of turnout, little is known about how the turnout of one voter is influenced by the characteristics of other voters around them. We geocode over 50 million voter registration...»

«Equities as Collateral In U.S. Securities Lending Transactions    A Study Implemented by    The RMA Executive Committee on   Securities Lending             March 2011       COMMITTEE ON COMMITTEE SECURITIES LENDING MEMBERS Chairman Michael P. McAuley Premier Global Securities Lending Attached please find a study with respect to the use of equity securities as collateral Patrick Avitabile Citi in agency securities lending transactions. This study was undertaken by...»

«Transportation Research Part A 45 (2011) 91–104 Contents lists available at ScienceDirect Transportation Research Part A journal homepage: www.elsevier.com/locate/tra Assessing the cost of transfer inconvenience in public transport systems: A case study of the London Underground Zhan Guo a,⇑, Nigel H.M. Wilson b,1 a Robert F. Wagner Graduate School of Public Service, New York University, 295 Lafayette St., Room 3038, New York, NY 10012, USA b Department of Civil and Environmental...»

«Read PDF Bundle Of Letters by our online Library. Free download Bundle Of Letters Books file documents BUNDLE OF LETTERS PDF Enjoy ways of help documentation is really a hard copy manual that's printed bundle of letters PDF nicely bound, and functional. It operates as a reference manual skim the TOC or index, get the page, and stick to the directions detail by detail. The challenge using these sorts of documents is the fact that user manuals can often become jumbled and hard tounderstand. And...»





 
<<  HOME   |    CONTACTS
2016 www.thesis.xlibx.info - Thesis, documentation, books

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.